Crawlspace Repair- Saint John, NB
Challenge
Solution
The production team, comprising a knowledgeable foreman and skilled installers, efficiently carried out the installation in the suited workspace. Engineered support using the SmartJack® System was applied. Galvanized steel columns were precision-cut, set on reinforced steel bases, and firmly anchored to the structure's girders. Utilizing adjustable top brackets and heavy-duty threaded rods, the team systematically restored the floor to a stable elevation. The outcome was significant for the homeowner and their house. The installation of the SmartJack® System not only addressed the immediate problem of floor stabilization but also ensured a lasting foundational solution. As with every project, we prioritized a clean setup and left the property in pristine condition, reinforcing our commitment to delivering a reliable and remarkable customer experience. This transformation provided the homeowner with renewed confidence in their property's integrity.